www.czechmat.com

concrete plant 90m3/h Stetter M2 (2020 engine)

_JINÉ Stetter - M2 TZ
Year of production - 1993


2.899.000,– CZK + VAT
0 EURO

INSTALMENTS FROM
33.361,- CZK + VAT
In stock: not
Our machine: not

Contact us: +420 608 244 776

Output: 15 Kw

Description:

concrete batching plant Stetter M2 TZ
made year 1993

capacity: 90m3/h
mixer: double-shaft dosing
3x silo a 60t = 180t

winter sheathing

filling system Würschum
year: 1994
3x drum W.A.M (IT)

15kw (IT) engine Wamgroup -year 2020

currently expertly disassembled.
delivery and installation possible.

foto
Repurchase Exchange Commission Leasing / Insurance

SECOND-HAND SHOP OF
BUILDING MACHINES AND TRUCKS

417 61 Bystřany u Teplic v Čechách
Teplická 313

   

Mo - Fri : 09 - 17
Sa + Sun : agreement
tel. : +420 608 244 780
        +420 608 244 776
e-mail : info@czechmat.cz